📍 Noida | 3–5 Years Experience
Join our BESS R&D team to work on grid integration, power system studies, compliance validation, and energy storage solutions.
Key Requirements:
• Experience of 3-5 years in power system studies, grid integration, and protection coordination
• Proficiency in ETAP, DIgSILENT PowerFactory, PSCAD, or similar tools
• Strong understanding of renewable energy and energy storage systems
• M.Tech in Electrical Engineering (Power Systems preferred)
This is an excellent opportunity to contribute to innovative energy storage solutions and support the transition to a smarter, more sustainable grid.
📩 Share your profile at sushmita.sutar@gpecosolutions.com
LinkedIn
Visit Website
